The coil tubing truck integrates gas, liquid, and electrical systems, featuring a complex structure and high automation level. It is used for transporting and handling continuous tubing. During operation, the continuous tubing winds and unwinds on the reel, and is fed into the well through the injector head to perform well repair and other operations.
The application range of coil tubing truck is extensive, suitable for various stages of drilling and oil production. It can not only perform sand flushing and simple well repair tasks, but also supports new operations such as cementing, fishing, logging, reaming, scale removal, completion, and drilling.
Features of LG360/LG450 Continuous Tubing Workover Equipment
1. Double truck loading, strong mobility, adapting to the harsh road conditions in Chinese oilfields;
2. Frame-type beam of the main vehicle, greatly improving the loading capacity;
3. Large-Capacity Drum,Capable of carrying 2-inch and larger diameter oil pipes. The integral design ensures simple and safe drum replacement.
4. Backup System for the Sprayer,designed with a backup system for the sprayer, meeting the customer's requirement for using two sprayers.
Model
|
LGC450 |
LGC360 |
Chassis
|
Main vehicle BENZ/MAN,Auxiliary vehicle Beiben/BENZ
|
|
Pick-up mode |
Chassis pick-up |
|
Drum capacity |
2”-6000m (1.75”-7500m) |
2”-6000m (1.75”-7500m) |
Injection head model |
100K |
80K |
Continuous lifting force of injection head |
4500kg |
36000kg |
Continuous downward pushing force of injection head |
22500kg |
18000kg |
Maximum working pressure |
69MPa/103.5Mpa |
|
Truck-mounted crane |
18T |
Штаб-квартира компании
© 2011 2024澳门原料网点 鄂ICP备19022945号 版权所有